Master Schedule Builder

Meet your master scheduling goals, maximize course fulfillment, and minimize conflicts. Use advanced and powerful tools designed for the most complex schedules.

Get Started
 

Build your best master schedule with confidence and on your terms

We understand the enormity of the challenge educators face each year when building a master schedule. Between requirements for each grade level, course requests, singletons, teacher and room availability and section balancing, planning out a successful high school schedule can consume many more hours, days or even weeks than any other school process. That is why we built the Super Deluxe Schedule Builder in AdminPlus®. It provides advanced and powerful tools to help you meet your scheduling goals, maximize course fulfillment, and minimize conflicts - all while sparing you the extra headaches that come with building a master schedule.

For elementary and middle school schedule building, learn more about our basic scheduling solutions here.
Soccer Ball Icon
Stay ahead of the game!

You don’t have to wait for the current school year to end to get started - create a new year and build your master schedule when it’s most convenient for your school.

Mouse Icon
Online Course Requests

Choose to assign courses to your students, allow them to choose their own, or even a combination of both. Complete course requests online to streamline the process.

Atom Icon
Lots of singletons?
No problem!

Don't worry about those pesky singletons. With our builder, you can work with your most difficult courses first to allow other sections and blocks to fall in place around them.

Ruler Icon
Advanced Specifications

The builder determines the best course combinations based on teacher preferences, room availability, period exclusions, section balancing, and many other constraints you specify.

"Rediker’s Master Schedule Builder is the best school scheduling tool I have ever used. The interactive scheduler is so unique and something I could never build a schedule without again. The investment in the Rediker SIS system is worth it just for the Master Schedule Builder!"

- Michelle Shaw, Director of Technology and Data, 

Fontbonne Academy, MA

"Our master schedule was created using the Rediker Software Master Schedule Builder and we were delighted with the results and the final product. It was a pleasure working with the Rediker team to make sure our scholars were ready for the new school year. We are looking forward to getting even more acclimated to Rediker's schedule building process."

- Ricardo Bartley, Guidance Counselor,

Summit Academy Charter School, NY

Scheduling requirements and advanced specifications

There is no compromising when using our Master Schedule Builder. It is equipped to meet the customization level you need to build a schedule that coincides with your school model, teacher availability, special programs, class size, etc. The builder will test, match and generate the best combinations based on the parameters and constraints you enter.

  • Singletons, doubletons, and multi-section courses
  • Preferred and secondary course teachers
  • Period exclusions
  • Block rotations
  • Scheduling cycles
  • Course priority levels
  • Linked and concurrent courses
  • Section balancing
  • Courses by quarter or semester
  • Prerequisites
AdminPlus Classic Master Schedule Building Scheduling Board
Microscope Icon

Build with control
and confidence

  • The builder tests each possible meeting time and shows you which times are best.
  • See how you’re doing with the graphical scheduling console and running “scoreboard”.
  • Keep your options open by saving and retrieving builds any time during the process.
  • Once you have a course scheduled, you can lock it to prevent shuffling.
  • Compare builds to determine the best possible schedule.

Course requests: Prepping your lists

Each high school has a different approach to assigning courses. Depending on your school model, you can choose to assign courses to your students, allow them to choose their own, or even a combination of both. 


Generate sign-up sheets, manual or scanned course request forms, course preference forms, and course request verification forms right in our Master Schedule Builder. Use our Online Forms to streamline the submission process.

Evaluate and resolve conflict

One of the most powerful tools in our Master Schedule Builder is the interactive mode, where you can see each course and the top recommended blocks to assign it. You can clearly see the number of scheduled and non-scheduled students in relation to the optimum size of each section. 


The Master Schedule Builder makes it easy to resolve conflicts, such as exceeding section optimums, higher priority courses, teacher availability, or too many courses requested. While using interactive mode, unscheduled students and teachers are listed automatically, making it convenient to click and view their schedules and conflicts at any stage of your current build. This allows you to evaluate how to adjust your build to maximize course fulfillment and finalize your master schedule.

Master Schedule Builder Process Infographic